S 212TH ST over SR 167 & SPRINGBROOK CK

2.8 N JCT SR 516 · County 033, Washington · Built 1973 · 5 Lanes · 31,076 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000QC0000000
Year Built
1973
Reconstructed
1992
Length
96.7 m (317.3 ft)
Max Span
31.6 m
Width
20.9 m (68.6 ft)
Lanes
5
Daily Traffic
31,076
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,522,000
Total Project Cost
$9,043,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.