SR 503 over CHELATCHIE CREEK

12.7 N JCT SR 502 · County 011, Washington · Built 1953 · 2 Lanes · 4,008 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000MM0000000
Year Built
1953
Length
9.4 m (30.8 ft)
Max Span
8.5 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
4,008
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$236,000
Total Project Cost
$471,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.