SR 21 over SAN POIL RIVER

41.9 N LINCOLN CO · County 019, Washington · Built 1927 · 2 Lanes · 406 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000HN0000000
Year Built
1927
Length
18.6 m (61 ft)
Max Span
9.1 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
406
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$406,000
Total Project Cost
$811,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.