BIA IRR RTE 3 over LAKE ROOSEVELT
2.2 MI S OF GIFFORD WA · County 065, Washington · Built 2011 · 1 Lanes · 300 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 8 | Very Good |
Location
48.278306, -118.137447
This bridge is in worse condition than 4% of bridges in County 065. The average bridge in Washington is 0 years old; this one is 15 years old.
Bridge Details
- Structure #
- 00000000000P342
- Year Built
- 2011
- Length
- 22.7 m (74.5 ft)
- Max Span
- 19.2 m
- Width
- 5.5 m (18 ft)
- Lanes
- 1
- Daily Traffic
- 300
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.