IRR BIA RTE 1 over WA-ATCH RIVER
4 KM S.W. OF NEAH BAY · County 009, Washington · Built 1961 · 2 Lanes · 300 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
48.346861, -124.662928
This bridge is in worse condition than 94.8% of bridges in County 009. The average bridge in Washington is 0 years old; this one is 65 years old.
Bridge Details
- Structure #
- 00000000000P061
- Year Built
- 1961
- Length
- 53.6 m (175.9 ft)
- Max Span
- 7.6 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 300
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $1,590,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.