IRR BIA RTE 1 over WA-ATCH RIVER

4 KM S.W. OF NEAH BAY · County 009, Washington · Built 1961 · 2 Lanes · 300 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 4 Poor
Substructure 7 Good

Location

48.346861, -124.662928

This bridge is in worse condition than 94.8% of bridges in County 009. The average bridge in Washington is 0 years old; this one is 65 years old.

Nearby Bridges

Bridge Details

Structure #
00000000000P061
Year Built
1961
Length
53.6 m (175.9 ft)
Max Span
7.6 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
300
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,590,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.