UNNAMED ROAD over NEW RIVER

NEW RIVER BRIDGE CROSSING · County 121, Virginia · Built 1943 · 2 Lanes · 400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
DAPAMCRAD000924
Year Built
1943
Reconstructed
1992
Length
311.5 m (1022 ft)
Max Span
50.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
400
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
Other
Last Inspected
N/A
Est. Improvement
$235,000
Total Project Cost
$235,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.