SKYLINE DRIVE over U.S. ROUTE 33

39.7 MILES TO INTERSECTIO · County 165, Virginia · Built 1973 · 4 Lanes · 443 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
4840003P0000000
Year Built
1973
Length
54.3 m (178.1 ft)
Max Span
30.5 m
Width
20 m (65.6 ft)
Lanes
4
Daily Traffic
443
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
National Park Service
Last Inspected
N/A
Est. Improvement
$1,100,000
Total Project Cost
$1,650,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.