SKYLINE DRIVE over RAMP (THORNTON GAP)

0.1 MILES TO INTERSECTION · County 139, Virginia · Built 1961 · 2 Lanes · 608 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
4840002P0000000
Year Built
1961
Length
21.2 m (69.6 ft)
Max Span
21.2 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
608
Material
Concrete
Design
Frame (except frame culverts)
Owner
National Park Service
Last Inspected
N/A
Est. Improvement
$15,000
Total Project Cost
$23,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.