GWMP (SB) over ABANDONED QUARRY

0.1 MILES SOUTH OF SPOUT · County 013, Virginia · Built 1993 · 2 Lanes · 56,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
3300043P0000000
Year Built
1993
Length
31.2 m (102.4 ft)
Max Span
30 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
56,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
National Park Service
Last Inspected
N/A
Est. Improvement
$40,000
Total Project Cost
$60,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.