RAMP ""H"" over RAMP ""N""

AIRPORT TERMINAL · County 013, Virginia · Built 1997 · 3 Lanes · 5,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
2110004P0000000
Year Built
1997
Length
602 m (1975.1 ft)
Max Span
13.4 m
Width
25.4 m (83.3 ft)
Lanes
3
Daily Traffic
5,000
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
Other
Last Inspected
N/A
Est. Improvement
$565,000
Total Project Cost
$848,000