FOREST ROAD over PEDLAR RIVER

BETWEEN SR 605 AND PARKWA · County 009, Virginia · Built 2021 · 1 Lanes · 50 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
080813000035107
Year Built
2021
Length
28.1 m (92.2 ft)
Max Span
27.4 m
Width
5.5 m (18 ft)
Lanes
1
Daily Traffic
50
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.