Fire Tower Road over Pope Swamp

0.35 Miles from Route 646 · County 093, Virginia · Built 2024 · 2 Lanes · 491 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000031570
Year Built
2024
Length
19.7 m (64.6 ft)
Max Span
19.3 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
491
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$84,000,000
Total Project Cost
$126,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.