Crest Hill Road over East Branch Thumb Run

.20 Fr 732 & 1.0 To 733 · County 061, Virginia · Built 2022 · 2 Lanes · 685 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000031561
Year Built
2022
Length
10.1 m (33.1 ft)
Max Span
8.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
685
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$170,000,000
Total Project Cost
$250,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.