ANDERSON DRIVE over WOODS CREEK

0.38 LETCHER AVE-0.17 END · County 163, Virginia · Built 2020 · 2 Lanes · 903 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000031315
Year Built
2020
Length
37.4 m (122.7 ft)
Max Span
31.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
903
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$375,000,000
Total Project Cost
$500,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.