I-66 EBL over LEE HIGHWAY

04.73FR234/01.05TO28 · County 059, Virginia · Built 2020 · 5 Lanes · 62,140 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000031244
Year Built
2020
Length
81.1 m (266.1 ft)
Max Span
40.5 m
Width
27.7 m (90.9 ft)
Lanes
5
Daily Traffic
62,140
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$100,000,000
Total Project Cost
$115,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.