TILLEYS BRIDGE RD over S FORK HOLSTON RIVER

.22 TORT650 & .38 TORT657 · County 173, Virginia · Built 2019 · 2 Lanes · 211 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000031243
Year Built
2019
Length
23.2 m (76.1 ft)
Max Span
11.6 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
211
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$92,000,000
Total Project Cost
$153,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.