CHESNUT GROVE ROAD over BIG WILSON CREEK

1.06MFRRT.735;.02MTORT835 · County 077, Virginia · Built 2020 · 2 Lanes · 110 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000031190
Year Built
2020
Length
13 m (42.7 ft)
Max Span
12.2 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
110
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$88,000,000
Total Project Cost
$140,400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.