I-77 SBL over COVE CREEK

1.65MTO81&3.74MTOBLANDC.L · County 197, Virginia · Built 2023 · 2 Lanes · 15,228 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000031083
Year Built
2023
Length
58.6 m (192.3 ft)
Max Span
57.3 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
15,228
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.