GOLF COURSE ROAD over BAXTER POND RUN

0.70 Fr 156 & 2.78 To 618 · County 149, Virginia · Built 2024 · 2 Lanes · 1,748 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000030983
Year Built
2024
Length
7 m (23 ft)
Max Span
6.1 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
1,748
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$120,000,000
Total Project Cost
$214,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.