Diascund Road over Diascund Creek

0.87 Mi To Route 603 · County 095, Virginia · Built 2023 · 1 Lanes · 677 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000030285
Year Built
2023
Length
20.1 m (65.9 ft)
Max Span
9.8 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
677
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.