ARROWHEAD VALLEY R over NORFOLK SOUTHERN RAILWAY

.10 From 29 & 1.29 To 818 · County 003, Virginia · Built 2012 · 1 Lanes · 130 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000030042
Year Built
2012
Length
29.8 m (97.8 ft)
Max Span
10.5 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
130
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.