Rmp JHS 95 FLYOVR over ROUTE 95 SB

0.84fr619 1.52to234 · County 153, Virginia · Built 2014 · 1 Lanes · 14,881 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000029965
Year Built
2014
Length
165.2 m (542 ft)
Max Span
73.2 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
14,881
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$2,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.