RTE.66 EBL over RTE.29

02.75FR15 /04.18TO 234 · County 153, Virginia · Built 2008 · 6 Lanes · 57,759 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000028854
Year Built
2008
Length
147.8 m (484.9 ft)
Max Span
47.5 m
Width
37.2 m (122 ft)
Lanes
6
Daily Traffic
57,759
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$3,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.