W.Park T Connector over RAMP CNE; 495 SB

0.01FR5061/0.01ToNBhtlane · County 059, Virginia · Built 2012 · 4 Lanes · 12,053 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000028683
Year Built
2012
Length
148.4 m (486.9 ft)
Max Span
56.9 m
Width
16.9 m (55.4 ft)
Lanes
4
Daily Traffic
12,053
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$2,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.