CUSTIS MEM PKWY WB over I-495NB &HOT; I-66 RAMPS
02.67FR0243/01.48TO0007 · County 059, Virginia · Built 2010 · 3 Lanes · 32,108 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.886944, -77.220017
This bridge is in worse condition than 35.5% of bridges in County 059. The average bridge in Virginia is 0 years old; this one is 16 years old.
Nearby Bridges
66 RAMP NWH over RTE.66 RAMP
Built 2012
I-66 WB over 66 RAMP & 495 HOT
Built 2010
I-66 RAMP SEH over I-495 HOT & 66 RMPS
Built 2010
I-495 & EXP NBL over RT I-495 I-66 AND METRO
Built 2022
WBL ROUTE 0066 over HOLMES RUN
Built 1982
I-495 GP SBL FO over I-66 WBL
Built 2022
CAPITAL BELTWAY over HOLMES RUN TRIB
Built 1963
I-495 EXP NBL FO over I-495 EXP GP NBL & Ramps
Built 2022
I-495 Ramp GNGW over I-495 Ramp GNGE
Built 2022
I-495 EXP SBL RAM over I-495 GP EXP SBL
Built 2022
Bridge Details
- Structure #
- 000000000028666
- Year Built
- 2010
- Length
- 128.2 m (420.6 ft)
- Max Span
- 55.3 m
- Width
- 27.6 m (90.6 ft)
- Lanes
- 3
- Daily Traffic
- 32,108
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $100,000,000
- Total Project Cost
- $250,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.