BIRCH GROVE ROAD over N FORK HOLSTON RIVER #3

.70-RT.625W;.30-RT.626E · County 021, Virginia · Built 2007 · 2 Lanes · 25 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000028543
Year Built
2007
Length
19.5 m (64 ft)
Max Span
9.8 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
25
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$97,000,000
Total Project Cost
$158,600,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.