BELCOURT CASTLE DR over TRIB. OF ELKLICK RUN

00.05FR PROV/0.08TO PONDE · County 107, Virginia · Built 2006 · 2 Lanes · 1,020 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000028539
Year Built
2006
Length
6.7 m (22 ft)
Max Span
6.1 m
Width
21.3 m (69.9 ft)
Lanes
2
Daily Traffic
1,020
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$15,900,000
Total Project Cost
$50,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.