CULVER LANE over DRAINAGE CANAL

0.01TOBIERCED/0.05TOALG C · County 810, Virginia · Built 1989 · 2 Lanes · 9,751 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000028050
Year Built
1989
Length
13.1 m (43 ft)
Max Span
13.1 m
Width
26.3 m (86.3 ft)
Lanes
2
Daily Traffic
9,751
Material
Concrete
Design
Arch - Deck
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$210,000,000
Total Project Cost
$280,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.