SUMMIT POINT RD over LONG MARSH RUN

0.65 TO 639 - 1.05 TO 654 · County 043, Virginia · Built 2000 · 2 Lanes · 2,130 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
000000000027644
Year Built
2000
Length
7.9 m (25.9 ft)
Max Span
3.7 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
2,130
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$35,000,000
Total Project Cost
$51,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.