I-395 NB over 495 & RAMPS E-SP; HS-W

00.85FR644/00.80TO648 · County 059, Virginia · Built 2007 · 4 Lanes · 86,915 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000027451
Year Built
2007
Length
96.6 m (316.9 ft)
Max Span
36 m
Width
21 m (68.9 ft)
Lanes
4
Daily Traffic
86,915
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$77,000,000
Total Project Cost
$350,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.