NEWLAND ROAD over CAT POINT CREEK

0.7M RTE 676-0.4M RTE 621 · County 159, Virginia · Built 2008 · 2 Lanes · 1,603 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000027344
Year Built
2008
Length
248.4 m (815 ft)
Max Span
23.8 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
1,603
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.