1-495 EBL over I-395N;S;HOV & HS-W;E-SP

02.59FR620/01.69TO613 · County 059, Virginia · Built 2003 · 5 Lanes · 105,239 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000026351
Year Built
2003
Length
426.7 m (1399.9 ft)
Max Span
54.6 m
Width
27.4 m (89.9 ft)
Lanes
5
Daily Traffic
105,239
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$57,000,000
Total Project Cost
$250,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.