US.58FLYOVER (WBL) over U.S.58 BUSINESS (EBL)

2.65 FR 15 & 0.45 TO 364 · County 117, Virginia · Built 2005 · 1 Lanes · 2,852 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000025888
Year Built
2005
Length
96 m (315 ft)
Max Span
40 m
Width
9.9 m (32.5 ft)
Lanes
1
Daily Traffic
2,852
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000,000
Total Project Cost
$311,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.