Sussex Drive over Nottoway River

2.09 Mi To Route 35 · County 183, Virginia · Built 2000 · 2 Lanes · 1,654 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000025651
Year Built
2000
Length
86 m (282.2 ft)
Max Span
18.6 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
1,654
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$102,800,000
Total Project Cost
$154,200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.