234 BYPASS SBL over I-66

00.60FR29/00.37TO621 · County 153, Virginia · Built 1997 · 3 Lanes · 5,790 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000024787
Year Built
1997
Length
109.4 m (358.9 ft)
Max Span
57 m
Width
16.9 m (55.4 ft)
Lanes
3
Daily Traffic
5,790
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$49,000,000
Total Project Cost
$150,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.