HOV RAMP TO CM.LOT over S.B.L. 95

01.70FRTE.123/00.65TO294 · County 153, Virginia · Built 1995 · 1 Lanes · 14,034 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000024484
Year Built
1995
Length
194.5 m (638.1 ft)
Max Span
50.3 m
Width
10.7 m (35.1 ft)
Lanes
1
Daily Traffic
14,034
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$100,000,000
Total Project Cost
$220,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.