Northampton Bl NBL over Lake Wright

0.66 ECL NORF/0.30 TO 165 · County 710, Virginia · Built 1995 · 3 Lanes · 17,669 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000024432
Year Built
1995
Length
18.3 m (60 ft)
Max Span
18.3 m
Width
13.7 m (44.9 ft)
Lanes
3
Daily Traffic
17,669
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$20,000,000
Total Project Cost
$40,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.