FAIRFAX COUNTY PKY over POPES HEAD RUN

1.40FR.123/02.35TO620 · County 059, Virginia · Built 1995 · 2 Lanes · 32,657 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000024243
Year Built
1995
Length
39.3 m (128.9 ft)
Max Span
38.4 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
32,657
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$33,000,000
Total Project Cost
$125,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.