DULLES GREENWAY WB over SULLY ROAD (RTE. 28)

02.60FR606/01.40TO657 · County 059, Virginia · Built 1995 · 2 Lanes · 38,873 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000024101
Year Built
1995
Length
122.5 m (401.9 ft)
Max Span
65.2 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
38,873
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$10,000,000
Total Project Cost
$25,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.