ROUTE 360 WBL over SWIFT CREEK

1.34 Fr 702 & 0.56 To 652 · County 041, Virginia · Built 1992 · 2 Lanes · 36,018 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000023546
Year Built
1992
Length
49.5 m (162.4 ft)
Max Span
20 m
Width
18.1 m (59.4 ft)
Lanes
2
Daily Traffic
36,018
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.