US 58 EBL Bypass over US 301

1.00 mi fr 95/1.90 to58 B · County 081, Virginia · Built 1993 · 3 Lanes · 7,852 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000023387
Year Built
1993
Length
52.4 m (171.9 ft)
Max Span
30.5 m
Width
19.3 m (63.3 ft)
Lanes
3
Daily Traffic
7,852
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.