North Church St over Pagan River @ Smithfield

0.39 Miles from Route 666 · County 093, Virginia · Built 1991 · 2 Lanes · 5,701 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000023090
Year Built
1991
Length
201.8 m (662.1 ft)
Max Span
18.3 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
5,701
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$880,000,000
Total Project Cost
$890,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.