ROUTE 61 over S FORK CLINCH RIVER

0.38TO 19; 13.58 BLAND CO · County 185, Virginia · Built 1991 · 2 Lanes · 3,908 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000022549
Year Built
1991
Length
17.7 m (58.1 ft)
Max Span
8.8 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
3,908
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.