I-81 SBL over US 21/52 (N 4th ST)

1.77M TO 656&2.03M TO 77 · County 197, Virginia · Built 1964 · 2 Lanes · 14,382 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000022366
Year Built
1964
Reconstructed
1990
Length
80.9 m (265.4 ft)
Max Span
22.9 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
14,382
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$150,000,000
Total Project Cost
$224,900,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.