SOUTH BAYARD AVE over ROCKFISH RUN

0.10 RT250;0.06DUPONT BLD · County 015, Virginia · Built 1932 · 2 Lanes · 2,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Culvert
4
Poor

Bridge Details

Structure #
000000000022297
Year Built
1932
Length
16.8 m (55.1 ft)
Max Span
4.9 m
Width
16.8 m (55.1 ft)
Lanes
2
Daily Traffic
2,500
Material
Steel
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$4,000,000
Total Project Cost
$6,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.