Turlington Road over Kilby Creek Spillway
1.10 TO 58 / 1.00 TO 685 · County 800, Virginia · Built 1957 · 2 Lanes · 2,327 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
36.711031, -76.626758
This bridge is in worse condition than 96.2% of bridges in County 800. The average bridge in Virginia is 0 years old; this one is 69 years old.
Nearby Bridges
ROUTE 13 SBL (BYP) over LAKE KILBY
Built 2002
ROUTE 13 NBL (BYP) over LAKE KILBY
Built 2002
ROUTE 13 SBL (BYP) over NS RAILWAY
Built 2002
ROUTE 13 NBL (BYP) over NS RAILWAY
Built 2002
ROUTE 13 NBL & SBL over STREAM
Built 2002
RAMP TO RT. 13 SBL over TURLINGTON RD. (RT. 688)
Built 2002
ROUTE 13 NBL (BYP over TURLINGTON RD. (RT. 688)
Built 2002
ROUTE 13 SBL (BYP) over TURLINGTON RD. (RT. 688)
Built 2002
TURLINGTON ROAD over KILBY CREEK
Built 1973
ROUTE 13 NBL RMP I over ROUTE 58 BUS.
Built 2002
Bridge Details
- Structure #
- 000000000022159
- Year Built
- 1957
- Length
- 18.9 m (62 ft)
- Max Span
- 9.4 m
- Width
- 6.4 m (21 ft)
- Lanes
- 2
- Daily Traffic
- 2,327
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $104,000,000
- Total Project Cost
- $156,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.