Summit Drive over Poplar Creek

.18-Edmunds/.17-Branco St · County 083, Virginia · Built 1932 · 2 Lanes · 175 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000021785
Year Built
1932
Reconstructed
2010
Length
8 m (26.2 ft)
Max Span
8 m
Width
5.8 m (19 ft)
Lanes
2
Daily Traffic
175
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$100,000,000
Total Project Cost
$150,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.