EBL ROUTE 0064 over CSX TRANSP & SHOCKOE CK

1.22 FR 95 & 0.73 TO 360 · County 087, Virginia · Built 1969 · 3 Lanes · 47,524 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000021433
Year Built
1969
Length
166.2 m (545.3 ft)
Max Span
53.1 m
Width
14.3 m (46.9 ft)
Lanes
3
Daily Traffic
47,524
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$600,000,000
Total Project Cost
$641,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.