2ND STREET over ROUTE 195 EXPRESSWAY

.01 BYRD ST .06 CANAL ST · County 760, Virginia · Built 1975 · 4 Lanes · 10,025 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000021341
Year Built
1975
Length
77.1 m (253 ft)
Max Span
31.4 m
Width
17.1 m (56.1 ft)
Lanes
4
Daily Traffic
10,025
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$143,000,000
Total Project Cost
$236,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.