INTERSTATE-85 NBL over HALIFAX RD & CSX TRANSP

1.47SCL Ptrbg 2.57 95 NBL · County 053, Virginia · Built 1958 · 2 Lanes · 28,449 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000000021118
Year Built
1958
Reconstructed
1997
Length
59.1 m (193.9 ft)
Max Span
32.8 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
28,449
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.